Welding of 36″ x 1.365KM Gas Pipeline
  • Project Name: Welding of 36
  • Client: Zakhem/ NGC/Iritobo Intl Ltd
  • Project Commencement Date: Aug –Sep 2013
  • Project Completion Date: Aug –Sep 2013
  • Project url: http://zakhem.com

Welding of 36″ x 1.365KM Gas Pipeline

This project entails the welding of a 36-inch diameter gas pipeline spanning a total distance of 1.365 kilometers. The welding process is a critical phase in the construction of the gas pipeline, ensuring the secure connection of pipeline sections to create a continuous and reliable conduit for the transportation of natural gas.

Key Project Details:

  • Pipeline Specifications: The gas pipeline in question has a diameter of 36 inches, capable of accommodating substantial volumes of natural gas.
  • Purpose: The primary purpose of this gas pipeline is to facilitate the safe and efficient transportation of natural gas from its source to its intended distribution or utilization point.
  • Pipeline Length: The total length of the gas pipeline is approximately 1.365 kilometers, designed to meet the specific requirements of this segment of the gas distribution network.
  • Welding Process: The project involves the precise and high-quality welding of individual pipeline sections, creating a continuous and robust pipeline system.
  • Location: The pipeline route is located in a designated geographic area, connecting the source point with the intended destination or distribution point.
  • Terrain and Environmental Considerations: The project takes into account the local terrain, soil conditions, and potential environmental impacts associated with pipeline construction in the chosen area.
  • Safety Measures: Rigorous safety protocols are implemented throughout the welding process to safeguard the well-being of workers, the local community, and the integrity of the pipeline system.
  • Regulatory Compliance: The project strictly adheres to all relevant industry regulations, safety standards, and environmental requirements to ensure its legality and sustainability.
  • Quality Assurance: The welding process is subject to stringent quality control measures to guarantee the integrity and reliability of the pipeline welds.
  • Timeline: A well-defined project timeline is established to ensure the timely completion of the welding activities, contributing to the overall progress of the gas pipeline construction.

This project represents a vital component of the regional gas distribution network, emphasizing the importance of high-quality welding to ensure the safety and reliability of the gas transportation infrastructure. Through meticulous welding practices and adherence to safety and regulatory standards, the 36-inch gas pipeline will contribute to the efficient distribution of natural gas in the area.