- Project Name: Crude And Gas Pipeline
- Client: Allied Mechanical And Pipeline Pipeline Services
- Project Commencement Date: November 2013
- Project Completion Date: June 2014
- Project url: https://alliedmechanical.com
Thrust Boring Of A Dual: Crude And Gas Pipeline
Project Description: Thrust Boring of a Dual 10″ x 120KM SCH 80 OREDOTO OGHAREFE Crude and Gas Pipeline
This project entails the precision and efficient execution of thrust boring operations for a dual pipeline system measuring 10 inches in diameter and spanning a length of 120 kilometers. The pipeline is constructed from Schedule 80 (SCH 80) materials and is designated for the transportation of crude oil and natural gas. The thrust boring operation will facilitate the installation of this critical energy infrastructure from the Oredoto source to the Ogharefe destination.
Key Project Details:
- Pipeline Type: Dual pipeline system consisting of two 10-inch pipes.
- Pipeline Material: Schedule 80 (SCH 80) materials are utilized for enhanced durability and pressure handling capabilities.
- Pipeline Purpose: The pipeline serves the crucial role of transporting both crude oil and natural gas, supporting the energy needs of the region.
- Pipeline Length: The total length of the pipeline to be installed via thrust boring is approximately 120 kilometers, ensuring the efficient conveyance of resources over a considerable distance.
- Thrust Boring Method: The project employs advanced thrust boring techniques, a trenchless technology, to create underground passages for the pipelines. This method minimizes surface disruption and environmental impact.
- Location: The pipeline extends from the Oredoto source point to the Ogharefe destination, traversing diverse terrains and geological conditions.
- Challenges: Given the length and diverse geography of the pipeline route, the project faces challenges such as varying soil conditions, river crossings, and potential environmental impacts, all of which require meticulous planning and execution.
- Safety and Environmental Considerations: Stringent safety measures and environmental protections are integral to this project, ensuring the well-being of workers, local communities, and the preservation of the natural environment.
- Regulatory Compliance: The project adheres to all relevant local, regional, and national regulations and standards governing pipeline construction and environmental conservation.
- Timelines: A well-structured timeline is established to facilitate the timely and efficient completion of the thrust boring operation and pipeline installation.
This project represents a significant undertaking in the energy sector, aiming to provide a reliable and efficient means of transporting crude oil and natural gas over an extensive distance while prioritizing safety, environmental stewardship, and regulatory compliance. The thrust boring method chosen for this project exemplifies innovative and responsible construction practices in the industry.