- Project Name: CONSTRUCTION AND INSTALLATION OF THE 18" X 1.5KM
- Client: ZAKHEM/NGC/ ASHIALIN INTERNATION LIMITED
- Project Commencement Date: January 26, 2019
- Project Completion Date: March 27, 2019
- Project url: www.example.com
CONSTRUCTION AND INSTALLATION OF THE 18″ X 1.5KM
Project Description
Construction and Installation of the 18″ x 1.5KM Geregu Sales Gas Pipeline for Zakhem/NGC/Ashialin International Limited
This project encompasses the construction and precise installation of an 18-inch diameter sales gas pipeline, spanning a distance of 1.5 kilometers. The pipeline serves as a vital component in the transportation of sales gas, facilitating the efficient distribution of this valuable energy resource for Zakhem/NGC/Ashialin International Limited.
Key Project Details:
- Pipeline Specifications: The gas pipeline is constructed with a diameter of 18 inches, designed to accommodate significant volumes of sales gas.
- Purpose: The primary objective of the gas pipeline is to ensure the safe and efficient distribution of sales gas, meeting the energy demands of the region.
- Pipeline Length: The total length of the gas pipeline is approximately 1.5 kilometers, aligning with the specific requirements of this segment of the gas distribution network.
- Construction and Installation: The project encompasses the construction, precise placement, and integration of the sales gas pipeline within the existing infrastructure.
- Project Collaboration: Zakhem/NGC/Ashialin International Limited is the collaborative entity overseeing and executing the project, emphasizing the importance of teamwork in achieving project success.
- Location: The pipeline route is situated in a designated geographic area, connecting the source point with the intended sales gas distribution or utilization point.
- Safety Measures: Stringent safety protocols are enforced throughout the project to ensure the protection of workers, the local community, and the integrity of the pipeline system.
- Regulatory Compliance: The project adheres to all relevant industry regulations, safety standards, and environmental requirements to ensure its legality and sustainability.
- Quality Assurance: The project places a strong emphasis on quality control to validate the integrity and reliability of the sales gas pipeline.
- Timelines: A well-defined project timeline is established to ensure the efficient completion of construction and pipeline installation activities, contributing to the overall progress of the gas distribution network.
This project plays a significant role in the regional gas distribution network, supporting the safe and reliable distribution of sales gas for Zakhem/NGC/Ashialin International Limited. Through meticulous construction and precise installation, the 18-inch gas pipeline contributes to the efficiency and reliability of the gas distribution infrastructure, meeting the energy needs of the region.