- Project Name: Construction and Installation
- Client: Zakhem/ NGC/ Iritobo Intl Ltd
- Project Commencement Date: October 2013
- Project Completion Date: October 2013
- Project url: httpS://zakhem.com
Construction and Installation of the 18″ x 1.5 km
This project involves the construction and precise installation of an 18-inch diameter sales gas pipeline spanning a total distance of 1.5 kilometers. The pipeline serves the critical function of transporting sales gas from the Geregu source point to its destination, ensuring the efficient distribution of this valuable energy resource.
Key Project Details:
- Pipeline Specifications: The pipeline is designed with an 18-inch diameter, making it capable of handling a significant volume of sales gas.
- Purpose: The primary purpose of this pipeline is to facilitate the transportation of sales gas from the Geregu source location to its intended point of use or distribution.
- Pipeline Length: The total length of the pipeline is approximately 1.5 kilometers, covering a relatively short distance while still playing a vital role in the gas distribution network.
- Construction Method: The project employs traditional construction and installation methods, including trenching and welding, to create a reliable and robust pipeline system.
- Location: The pipeline route is situated in a specific geographic area, connecting the Geregu source with the designated sales or distribution point.
- Terrain and Environmental Factors: The project considers the local terrain, soil conditions, and potential environmental impacts associated with pipeline construction in the chosen area.
- Safety Measures: Stringent safety measures are implemented throughout the project to protect workers, the surrounding communities, and the integrity of the pipeline system.
- Regulatory Compliance: The project strictly adheres to all relevant industry regulations, safety standards, and environmental requirements to ensure its legality and sustainability.
- Timeline: A well-defined project timeline is established to ensure the timely completion of construction and pipeline installation activities.
- Testing and Commissioning: Prior to being put into operation, the pipeline undergoes thorough testing and commissioning to verify its integrity and functionality.
This project represents a crucial component of the regional gas distribution network, enabling the efficient transportation of sales gas from the Geregu source to support energy needs. With a focus on safety, regulatory compliance, and reliability, the construction and installation of this 18-inch pipeline are integral to the energy infrastructure in the area.