Construction and Installation of the 18″ x 1.5 km

Construction and Installation of the 18″ x 1.5 km

This project involves the construction and precise installation of an 18-inch diameter sales gas pipeline spanning a total distance of 1.5 kilometers. The pipeline serves the critical function of transporting
THRUST BORING OF A DUAL 10″ X 24M

THRUST BORING OF A DUAL 10″ X 24M

Project Description Thrust Boring of a Dual 10″ x 24M SCH 80 Crude and Gas Pipeline Across Ologbo, Benin/Express Road for Nigeria Petroleum Development Company/AMPS This project involves the precision
Welding of 36″ x 1.365KM Gas Pipeline

Welding of 36″ x 1.365KM Gas Pipeline

This project entails the welding of a 36-inch diameter gas pipeline spanning a total distance of 1.365 kilometers. The welding process is a critical phase in the construction of the
Thrust Boring Of A Dual: Crude And Gas Pipeline

Thrust Boring Of A Dual: Crude And Gas Pipeline

Project Description: Thrust Boring of a Dual 10″ x 120KM SCH 80 OREDOTO OGHAREFE Crude and Gas Pipeline This project entails the precision and efficient execution of thrust boring operations
Fabrication and Hook-Up/Tie-In

Fabrication and Hook-Up/Tie-In

Fabrication and Hook-Up/Tie-In of Gas De-Sanding Unit at Iganmu, Lagos This project involves the fabrication and subsequent hook-up/tie-in of a Gas De-Sanding Unit at the Iganmu location in Lagos. The
CONSTRUCTION AND INSTALLATION OF THE 18″ X 1.5KM

CONSTRUCTION AND INSTALLATION OF THE 18″ X 1.5KM

Project Description Construction and Installation of the 18″ x 1.5KM Geregu Sales Gas Pipeline for Zakhem/NGC/Ashialin International Limited This project encompasses the construction and precise installation of an 18-inch diameter